VapeWholesaleHub  |  Wholesale supplier · Shenzhen, China
Tel / WeChat / WhatsApp: +86 13711127975  |  vape@0099933.xyz
Home  /  Starter Vape Kit  /  How to source Starter Vape Kit size run quick reference
starter vape kits · B2B buyers

How to source Starter Vape Kit size run quick reference

We ship starter vape kits to distributors, chain buyers and independent shops. What follows is the material we normally cover in a first conversation: what we hold in stock, how we test it, how it ships, and what happens when a carton arrives damaged.

Published 21 December 2024  ·  VapeWholesaleHub  ·  Reading time 5 min

Carton-ready units from the same batch, coded for traceability.
Carton-ready units from the same batch, coded for traceability.
Unit from the retained reference sample held against this order number.
Unit from the retained reference sample held against this order number.
Finish and assembly detail checked against the approved reference sample.
Finish and assembly detail checked against the approved reference sample.

What your market will ask for

This page is for B2B buyers who want a working answer on specification, price and lead time before they commit a purchase order. We have written the detail down so nobody has to sit through a sales call to extract it.

We keep batch codes traceable from carton to production date. When a market authority asks for traceability, a supplier who cannot produce it in an hour becomes a liability very quickly.

If you sell into a market that requires child-resistant packaging, say so at quotation stage. Retrofitting a CR closure onto a finished bottle design usually means a new mould and a four week delay.

Quality control, in plain terms

We photograph the packing station during production for volume orders. It is a small thing, but it settles most arguments about what was actually in the carton before it was sealed.

Leak complaints almost always trace back to one of three things: an over-torqued centre post, a seal that sat in a hot container, or a fill volume pushed past the design limit. We cap fill volume slightly below maximum for exactly that reason.

For B2B buyers, the practical answer is usually a shorter range: two core lines, one step-up, one trial SKU. Everything else is inventory risk wearing a nice finish.

How orders move from factory to shelf

Transit times move with the season. Book space early for Q4 and around Chinese New Year, when factory output pauses for two to three weeks and freight rates tighten at the same time.

We ship from Shenzhen and Guangzhou: air express for samples and part loads, sea freight for volume. Typical production lead time is 15 working days after artwork approval, plus transit. We quote both routes so you can see the trade-off instead of guessing at it.

  • Artwork proof plus physical dummy for custom packaging
  • Private label files archived for future rebrands
  • Seven-day defect reporting with replace-or-credit
  • Mixed SKU cartons to spread first-order risk
  • Document pack prepared per destination market
  • Named account contact who has handled the product

What happens when something goes wrong

Technical questions usually arrive at the worst possible moment, which is why we answer them on WhatsApp as well as email. A photo and a two line message resolves most issues faster than a ticket.

Reorders are the real test of a supplier. If the second shipment does not match the first, the relationship is over regardless of price, so we treat the reorder as the actual deliverable.

Specification summary

Typical specification for this category
Battery500 mAh
Pod capacity2.5 ml
Coil resistance1.0 ohm
IncludedDevice, pod, cable
ChargingUSB-C 5V/1A
PackagingRetail box
Minimum order200 units per SKU, mixed cartons allowed
Lead time30 working days after artwork approval

The detail above is what we hold ourselves to on every shipment, including the small ones. It is also the list we will walk through with you before the first order.

Frequently asked

What is the minimum order for starter vape kit?

Standard configurations start at 50 units per SKU, with mixed SKUs allowed inside the same carton. Custom colours, custom packaging or a private label run usually start at 200 units because of setup time on the line.

How long does production take?

Around 15 working days after artwork approval for stock configurations, plus transit. Custom runs add roughly a week for tooling and a physical dummy. We confirm the date in writing on the order acknowledgement.

What happens if part of the order is defective?

Report within seven days with photos and the batch code. Confirmed defects are replaced or credited on the next shipment. The failure is logged by mode and batch, and reviewed monthly with the factory.

Related reading

Need a quotation on starter vape kits?

Send destination market, target price and quantity. Same-day reply on working days.

Tel / WeChat / WhatsApp +86 13711127975  ·  vape@0099933.xyz

Talk to the supply team

Ask for a quotation on starter vape kits

Tell us the market you sell into and the price band you work in. You will get a specification and a landed cost estimate, not a catalogue dump.

What to send

Destination market, target retail price, quantity per SKU, and whether you need private label. With those four lines we can quote the same day.

Samples ship by air express and the cost is credited against your first production order.

Email the team
WhatsApp Email us